Posted on

Pumping Stringy Material at Wastewater Plants

December, 2019 1

Any wastewater treatment plant operator will typically tell you that one of the biggest hassles they face daily is pumping stringy material from a variety of sources. The problem here is that the material tends to get stuck in the impellers of trash pumps and wreak havoc on lobe pumps. Phil H. from Clyde, Texas tells us about his quest to find a better solution

read more
Posted on

Sewage Handling Lift Stations

December, 2019 2

Our latest Wastecorp trash pump sewage lift stations have hit the market with two to four unit pump models available. Whether you need to replace your above ground, below ground, pre-engineered or auto-start pump stations there are a number of options available to you. For example, all pre-engineered sewage lift stations can accommodate up to 10" trash pumps capable of pumping up to 3500 GPM.

read more