How to resolve sewage pumping problems at smaller WWTP’s is a question on the minds of thousands of operators worldwide. These facilities pump municipal sewage, storm water, melting snow, road grit and so much more for smaller communities. While the gallons per day pumped may not be as high as urban sewage treatment plants, the need for reliable sludge pumps is just as great. Wastecorp was contacted by a South New Jersey WWTP to provide upgraded sewage pumps to transfer wastewater, sludge and storm water from a smaller holding tank area. The pumps then transfer waste to both the facility’s lift station and digesters. The sewage pumps were also specified to unload local tanker trucks delivering everything from septic waste to waste trap grease and other solids laden liquids.
Resolving Sewage Pump Problems at Smaller WWTP’s
by wastecorp
0 Comments to this post
Wastecorp Keeps Pumping Through New England Storm
by wastecorp
0 Comments to this post
The show was to kick off Wastecorp’s 2015 promotional campaign with its Sludge Pro Double Disc Pumps, Mud Sucker Diaphragm Pumps, Trash Flow Trash Pumps and Sludge Master Plunger Pumps. The NEWEA annual conference in January involves many of Wastecorp’s nearby Wastewater Treatment Facilities in Plymouth, Providence, City of Boston, Sandwich, City of New Haven
read more